Vyšehrad tunnel to see repairs

A small tunnel below Vyšehrad in Prague used by trams and some 20,000 motorists daily will be closed for four weeks, with traffic re-routed until the end of November. Repairs on local tram track are the reason: a stretch of track leading 300 metres along Podolí and the Vltava river, as well as through the tunnel, was last repaired 26 years ago, the Prague Transport Authority has said. Trams into the centre will be re-routed through Albertov.

Author: Jan Velinger